Process map · Manufacturing

Month-end close in a manufacturing company

A factory closes its month on the shop floor as much as in the accounts office. Materials issued to jobs that are not finished have to be valued, what was really used has to be compared with the bill of materials, and the overhead charged to products has to be checked against what the factory actually cost. This map follows that version.

Select a step to see who does it, the document and the ERPNext screen.

Step by step

  1. Besides invoices and deliveries, the accountant checks the production documents: materials issued to the floor, completed quantities and job cards for the month are all submitted. A Work Order that was finished on the floor but is still open in the system is closed with the date it really finished.

    Who does it
    Accountant

    ERPNext then does this by itself

    • Each document posts to the month of its posting date
    • Goods delivered but not billed, and received but not billed, show in their own reports

    Without an ERP

    Finished goods are shipped before production has been entered. Stock goes negative, costs are missing, and the entries are forced through next month with the wrong date.

  2. The statement of each bank account is imported and matched line by line with the payments and receipts in the books, up to the last day of the month. Bank charges and interest that appear only on the statement are entered from the same screen.

    Who does it
    Accountant
    Document that comes out
    Reconciled bank accounts

    ERPNext then does this by itself

    • Likely matches are suggested by amount, date and reference
    • The balance in the books shows beside the balance on the statement
    • Matched payments get their clearance date

    Without an ERP

    The cash figure in the balance sheet is the ledger's balance, not the bank's. Uncleared cheques and missed bank charges hide inside it for months.

    ERPNext 16: Bank Reconciliation Tool with statement and ERP closing balances, a difference of AED -262.50 and unreconciled bank transactions
    ERPNext 16 · Bank Reconciliation Tool
  3. As jobs are completed, the hourly rates set on workstations add operating cost to the finished goods. At month end the total absorbed this way is compared with the factory's actual rent, power and wages, and the amount over or under absorbed is cleared by Journal Entry. Accruals and prepayments are posted as in any company.

    Who does it
    Accountant
    Document that comes out
    Journal Entry

    ERPNext then does this by itself

    • A repeating entry can be set up to be created every month
    • An accrual can be reversed in the next month from the entry itself
    • Each entry keeps who posted it and when

    Without an ERP

    Hourly rates were set when the factory opened and never checked. Products look profitable on paper while the real overhead piles up in an account nobody reviews.

    ERPNext 16: Submitted accrual journal entry debiting utility, telephone and office maintenance expenses and crediting accrued expenses, AED 11,190
    ERPNext 16 · Journal Entry
  4. The Trial Balance for the month is read line by line against the month before. The accountant looks for balances on the wrong side, suspense and clearing accounts that should be nil, and expense lines that jumped or vanished. Any figure opens into the entries behind it.

    Who does it
    Accountant
    Document that comes out
    Trial Balance

    ERPNext then does this by itself

    • Opening balance, movement and closing balance show for every account
    • Debits always equal credits, because every entry is posted in pairs

    Without an ERP

    The trial balance is assembled in a spreadsheet from exported ledgers. A formula misses a row, and the difference is pushed into a suspense account to make it balance.

  5. Once the figures are agreed, the month is closed with an Accounting Period, which stops new sales, purchase, payment and journal documents being dated inside it. The accounts can also be frozen up to a date, so only one trusted role can post earlier. At the end of the financial year, a Period Closing Voucher moves the year's profit or loss to retained earnings.

    Who does it
    Finance manager
    Document that comes out
    Accounting Period

    ERPNext then does this by itself

    • A document dated inside a closed period is refused with a message
    • Only the role you name can post before the frozen date

    Without an ERP

    Someone back-dates an invoice into a month that was already reported. The figures the owner saw no longer match the system, and nobody notices until the audit.

    ERPNext 16: Accounting Period October 2026 with the list of closed document types such as sales invoice, purchase invoice and journal entry
    ERPNext 16 · Accounting Period (closed)
  6. The Profit and Loss, Balance Sheet and Cash Flow statements are run for the month and set beside earlier months. The Budget Variance report shows where spending left the plan. Each report can be split by cost centre and sent to the owners as a PDF or a spreadsheet.

    Who does it
    Finance manager
    Document that comes out
    Profit and Loss, Balance Sheet and Cash Flow

    ERPNext then does this by itself

    • All reports are built from the same ledger, so they agree with each other
    • Any figure opens into the accounts and entries behind it
    • A report can be set up to be emailed on a schedule

    Without an ERP

    The management pack is rebuilt in a spreadsheet every month and arrives weeks late. By then the decisions it should have informed are already taken.

    ERPNext 16: Monthly P&L with income/expense/net bars and AED 669K net profit, account rows below
    ERPNext 16 · Profit and Loss report

The Full map adds 12 more steps: the approvals, checks and branches between these.

For example
At month end six Work Orders are still open. The accountant agrees the value of materials sitting in them, finds one finished order that used far more film than its bill of materials allows, and clears the overhead difference before the month is locked.

What changes in a manufacturing company. The same process, the steps this industry really uses.

  • Work in progress is a real number

    Materials issued to open Work Orders sit in a work in progress warehouse at cost. Their value is read from the system, not estimated by walking the floor.

  • Actual use is compared with the bill of materials

    For every finished order, what was consumed is set against what the bill of materials required. Overuse and scrap are seen within the month, while someone still remembers why.

  • Overhead is absorbed, then checked

    Hourly rates on workstations add operating cost to each product. At month end the amount absorbed is compared with the factory's real costs and the difference is dealt with.

Where this map leads

Processes feed each other. Follow the work into the next map.

Free tool

Build your company's map

Pick your industry and the processes you run. Get one printable document with every map and step, ready to show your team or your ERP partner.

See it live in a demo
  • Month-end close
  • Order to cash
  • Purchase to pay
  • Plan to produce
  • Hire to retire

Questions about month-end close

Ask us anything else
What should we check on open work orders at month end?
List the work orders still in process and compare the materials transferred to each with what has been made. An order that finished weeks ago but still holds material needs its production entry, or a return of the leftover to the store. What remains is your work in progress, valued at the cost of the materials in that warehouse.
How do I compare actual production cost with the bill of materials?
Every Work Order keeps the quantity of each material the bill of materials required beside the quantity really consumed. The BOM Variance report lists the differences, and job cards show actual time against planned time for each operation.
How does ERPNext handle factory overhead?
Each workstation has an hourly rate that can include power, rent, wages and consumables. The time booked on an operation, multiplied by that rate, is added to the cost of the finished goods. Comparing the total absorbed with real factory costs is a month-end check.

See this process run on your own data

A 45-minute ERPNext demo that follows this map with an example from your business.